Instructions to the candidates

  1. Attempt Q.1 or Q.2, Q.3 or Q.4, Q.5 or Q.6, Q.7 or Q.8.
  2. Figures to the right indicate full marks.
  3. Neat diagram must be drawn wherever necessary.
  4. Assume suitable data if necessary.

Questions

  1. Q1

    1. a)

      Explain LOC based estimation with example.

      [6]
    2. b)

      What is the need of project estimation? Explain the steps for estimation of software.

      Also asked:May 2024

      [6]
    3. c)

      Define timeline chart. Explain it with suitable example.

      [6]
  2. Q2

    1. a)

      Compare Lines of Code(LOC) and Function Point (FP) based estimation techniques with suitable example.

      [6]
    2. b)

      Explain COCOMO model for project estimation with suitable example.

      [6]
    3. c)

      Define project scheduling. Explain basic principles of project scheduling.

      Also asked:May 2024

      [6]
  3. Q3

    1. a)

      Explain in detail layered architecture style.

      [6]
    2. b)

      State and explain the golden rules of User Interface design.

      Also asked:May 2025 ·May 2023

      [6]
    3. c)

      Different between cohesion and coupling.

      [5]
  4. Q4

    1. a)

      Describe the data centered architecture with merits and demerits.

      [6]
    2. b)

      Why software engineering should have high cohesion and low coupling? Justify.

      [6]
    3. c)

      List the design concepts. Explain importance of refactoring in improving the quality of software.

      Also asked:May 2025

      [5]
  5. Q5

    1. a)

      List the advantages of SCM Repository. Explain functions performed by SCM Repository.

      Also asked:May 2025 ·Dec 2023

      [6]
    2. b)

      Define software risk in detail. Explain the different types of software risks.

      Also asked:May 2024

      [6]
    3. c)

      Explain risk identification and assessment process for software project.

      [6]
  6. Q6

    1. a)

      Explain Software Configuration Management (SCM) process.

      Also asked:May 2024

      [6]
    2. b)

      Discuss any two of the following. i) Risk Refinement ii) Risk Mitigation iii) Risk Management

      Also asked:May 2025 ·Dec 2023

      [6]
    3. c)

      Write a short note on change control mechanism in SCM.

      Also asked:May 2025

      [6]
  7. Q7

    1. a)

      Define software testing. Explain software testing strategies for software development.

      [6]
    2. b)

      Explain any two of the following in detail : i) System testing ii) Acceptance testing iii) Smoke testing

      [6]
    3. c)

      Differentiate between verification and validation.

      [5]
  8. Q8

    1. a)

      Explain integration testing and its objectives.

      [6]
    2. b)

      What is Test plan? Explain Validation testing in details. How configuration Review is Important?

      [6]
    3. c)

      Differentiate between white box and black box testing. 

      Also asked:May 2024

      [5]